Home » Projects » Structural Steelwork »
Glynde Mews
Location: London
Summary: New steel frame for an office structure.
Specification: To provide a new steel structure ready for cladding by others. This included the management of the structural design.
Challenges of the task: To develop the design of the steel structure in line with specific architectural curved design and to deliver fabrication details to suit.