Milton Keynes Network Rail Head Office
Location: Milton Keynes – Bedfordshire
Summary: New staircase & bridge structure.
Specification: To provide new staircase & bridge structure.
Challenges of the task: To develop the design of the bridge as the bottom boom was designed to eliminate the staircase vibration frequency.
The stainless steel cladding to the staircase stringers & bridge was also challenging as the final aesthetic appearance had very little tolerance so this was all drawn & manufactured in line with site survey checks.